Prompt
How do I set up a client approval workflow for deliverable review tracking and external client access?
Latest observation
A good client approval workflow usually has two parts:
- Internal review and tracking for your team
- External client access so clients can review, comment, and approve deliverables securely
Here’s a practical setup you can use.
1. Define the approval stages
Set clear statuses for each deliverable. A simple workflow might be:
- Draft
- Internal Review
- Client Review
- Revisions Needed
- Approved
- Archived
If you need more control, add:
- Waiting on Client
- Waiting on Internal
- Approved with Changes
- Rejected
This gives everyone one shared view of where the deliverable stands.
2. Track the right fields for each deliverable
For each item, track at least:
- Deliverable name
- Client name / account
- Owner
- Due date
- Current status
- Version number
- Review comments
- Approval date
- Approved by
- Link to file or preview
- Revision history
Optional but useful:
- Priority
- Internal reviewer
- Client reviewer
- SLA / response deadline
- Final sign-off required by
3. Build an internal review tracker
Use a shared system your team updates consistently. This can be:
- Project management software
- Spreadsheet
- Database table
- Notion/Airtable-style tracker
- CRM/project portal
Recommended internal view
Create a dashboard showing:
- Deliverables awaiting review
- Deliverables waiting on client
- Overdue approvals
- Approved deliverables
- Items needing revision
Internal process
- Team uploads a draft
- Internal reviewer checks it
- Status changes to Client Review
- Client gets notified
- Feedback is logged
- Revisions are made
- Final approval is recorded
4. Set up external client access
You want clients to review without giving access to your full internal workspace.
Best practice: separate client portal or guest access
Use one of these models:
- Client portal with limited permissions
- Guest accounts restricted to specific projects/files
- Shared review links with comment-only access
- Approval-only interface if comments are handled elsewhere
Permissions to limit
Clients should usually be able to:
- View assigned deliverables
- Comment or annotate
- Approve or request changes
They should usually not be able to:
- See internal notes
- Edit statuses freely
- Access unrelated projects
- Download sensitive source files unless intended
5. Define the approval process clearly
A simple approval flow:
- Internal team submits deliverable
- System notifies client reviewer
- Client reviews within a set time
- Client chooses:
- Approve
- Request changes
- Reject
- If changes requested, item returns to internal team
- Revised version is uploaded
- Final approval is captured
- Deliverable is marked complete
Important
Make sure each approval is tied to:
- A specific version
- A specific client reviewer
- A timestamp
- A comment history
That avoids confusion later.
6. Add version control
Version tracking is essential for deliverables.
Example:
- v1.0 = first internal draft
- v1.1 = revised after internal feedback
- v2.0 = client-facing revision
- v2.1 = final tweak
Always store:
- Version number
- What changed
- Who approved that version
This is especially important if clients review multiple iterations.
7. Use notifications and reminders
Automate reminders so things do not stall.
Examples:
- Notify client when item enters Client Review
- Reminder after 2 days with no response
- Escalation after 5 business days
- Notify account manager when approval is complete
Also notify internal staff when:
- Client requests changes
- Approval is rejected
- Due date is approaching
8. Create approval rules
You may want different approvals depending on deliverable type.
Examples:
- Marketing assets require both account manager and client sign-off
- Legal docs require compliance review
- Design items require only one client approver
- High-value deliverables require multi-level approval
Set rules like:
- Who can approve
- How many approvers are required
- Whether approval must be unanimous
- What happens if the approver is unavailable
9. Make comments structured
Unstructured feedback can become messy fast. Use a standard format such as:
- Location / section
- Issue type
- Suggested change
- Priority
- Resolved status
For example:
- Section: Homepage hero
- Comment: Replace headline with shorter version
- Priority: High
- Status: Open / Resolved
This makes review easier to manage.
10. Keep audit trails
For accountability, log:
- Who submitted the deliverable
- Who reviewed it
- Who approved it
- When each action happened
- What changed between versions
This is useful for:
- Client disputes
- Compliance
- Internal reporting
- Contract management
11. Recommended workflow structure
A clean version looks like this:
Internal
- Draft created
- Internal QA
- Internal approval
- Sent to client
External
- Client notified
- Client reviews
- Client comments / approves
- Revisions if needed
- Final approval
Closeout
- Final file stored
- Status updated to approved
- Deliverable archived
- Reporting updated
12. If you want a simple tool stack
You can implement this with:
- Tracker: Airtable, Notion, ClickUp, Asana, Monday, Jira, or a database
- File review: Google Drive, Dropbox, Frame.io, Filestage, or similar
- Client access: guest links, portal, or review tool
- Automation: Zapier, Make, native workflows, or API integration
13. Example fields for a deliverable tracker
| Field | Purpose |
|---|---|
| Deliverable ID | Unique reference |
| Client | Account name |
| Project | Campaign/project name |
| Deliverable type | Design, copy, video, etc. |
| Owner | Internal owner |
| Reviewer | Internal reviewer |
| Client approver | External approver |
| Status | Current stage |
| Version | Current version |
| Due date | Deadline |
| Review deadline | Client feedback due date |
| Comments | Feedback log |
| Approval date | Final approval timestamp |
| Approval result | Approved / changes requested |
14. Common mistakes to avoid
- Giving clients access to internal-only spaces
- Not tracking versions
- Allowing approval without recorded timestamps
- Mixing feedback from multiple versions
- Using vague statuses like “in progress”
- Not setting review deadlines
- No single source of truth for final approval
15. A good starting setup
If you want something simple and effective:
- Use a shared deliverable tracker
- Add statuses: Draft, Internal Review, Client Review, Revision, Approved
- Create guest client access to only relevant files
- Require comments and approvals on specific versions
- Automate notifications and reminders
- Keep an audit trail of every approval
If you want, I can also help you with one of these:
- a sample approval workflow diagram
- a spreadsheet/template for tracking deliverables
- a database schema for client approvals
- a recommended tool setup based on your team size
Observation history
Unlock observation history
Create a free Obsurfable account to unlock historical responses, model comparisons, and deeper brand intelligence.
How did Obsurfable measure this prompt?
Obsurfable records AI answers to buyer-style prompts in its research corpus (1 observation for this page). Metrics are distributions over observations, not a single static ranking.
Which AI systems does Obsurfable collect answers from?
OpenAI, ChatGPT, Google, Gemini, Google AI Mode, Anthropic, Claude, Perplexity, Grok, DeepSeek, Mistral, Copilot, and Meta AI.