Here’s a practical way to set up review and approval platform workflows for submittals and redlines in a consulting engineering team.
1) Start with the process, not the software
Before configuring any platform, define:
- What gets reviewed
- Submittals: shop drawings, product data, calculations, RFIs, deliverables, reports
- Redlines: markups to drawings/specs issued for internal coordination or as-builts
- Who reviews what
- Discipline lead
- Project manager
- QA/QC reviewer
- Specialist reviewer
- Client/owner reviewer, if applicable
- Approval outcomes
- Approved
- Approved with comments
- Revise and resubmit
- Rejected
- Timing/SLA
- e.g. internal review within 3 business days, client review within 5 business days
- Authority
- Who can approve, who can only comment, and who can override
This avoids building a workflow that looks nice but doesn’t match how your team actually works.
2) Define two separate workflows
Submittals and redlines usually need different structures.
A. Submittal workflow
Typical stages:
- Submission intake
- Uploaded by PM, coordinator, or external party
- Required metadata captured:
- Project ID
- Submittal type
- Spec section / discipline
- Revision number
- Due date
- Responsible reviewer
- Triage / completeness check
- Admin or coordinator confirms the package is complete
- If incomplete, return without entering formal review
- Technical review
- Assigned reviewer(s) examine against scope/specs
- Comments and markups recorded in-platform
- QA/QC check
- Optional but recommended
- Ensures consistency with standards and internal quality
- Approval decision
- Approve / approve with comments / revise and resubmit / reject
- Response issuance
- Formal response generated and sent to client/contractor
- Archive
- Final PDF, comments, transmittal, and decision saved to project record
B. Redline workflow
Typical stages:
- Markup intake
- Redlines uploaded from field, reviewer, or design team
- Source identified:
- Field markups
- Client comments
- Internal design changes
- Categorization
- Major design change
- Minor editorial correction
- Coordination issue
- As-built update
- Review
- Discipline lead confirms technical correctness
- PM confirms scope/schedule/cost impact
- Disposition
- Accepted
- Accepted with changes
- Deferred
- Rejected
- Update production
- CAD/BIM/document owner updates controlled files
- Verification
- Second-person check or QA/QC if needed
- Issue revised set
- New revision/version published
- Archive and traceability
- Keep original redlines, revised file, and approval history
3) Set up roles and permissions carefully
A good workflow depends on clear access control.
Common roles
- Submitter: uploads documents, sees status
- Coordinator/Admin: routes items, checks completeness
- Reviewer: comments, marks up, recommends disposition
- Approver: makes final approval decision
- Viewer: read-only access
- External stakeholder: limited access to assigned items only
Permission principles
- Only one person should own the final disposition for each review cycle
- Reviewers can comment, but not change status unless authorized
- External users should only see items assigned to them
- Preserve audit trails for every action
4) Build routing rules
Use rules to automatically send items to the right people.
Examples:
- If discipline = structural, route to structural lead and QA/QC engineer
- If submittal type = equipment, route to MEP lead and project manager
- If redline contains “change order”, route to PM and commercial manager
- If document value > threshold, require senior approval
- If revision > 2, trigger escalation
Routing can be based on:
- Discipline
- Project phase
- Contract type
- Client requirements
- Document type
- Complexity or risk score
5) Standardize review statuses
Keep status names simple and consistent.
Recommended statuses:
- Draft
- Submitted
- Under Review
- In QA/QC
- Comment Returned
- Approved
- Approved with Comments
- Revise and Resubmit
- Rejected
- Superseded
- Closed
Avoid too many custom statuses unless they map to a real process step.
6) Make comments actionable
A review platform should support structured comments, not just free text.
For each comment, capture:
- Location in document
- Comment type:
- Technical
- Editorial
- Coordination
- Compliance
- Severity:
- Minor
- Major
- Critical
- Assigned owner
- Due date
- Resolution status:
- Open
- Responded
- Accepted
- Rejected with justification
- Closed
This makes response tracking much easier.
7) Use version control rigorously
This is essential for consulting engineering.
Rules
- One source of truth for each controlled document
- Every upload gets a unique version number
- Prior versions are locked or archived
- Link comments to the exact version reviewed
- Never overwrite approved files
Good practice
Project-Discipline-DocType-RevX- Include date, author, and approval stamp
- Maintain a revision log
8) Define transmittal and approval outputs
The workflow should automatically produce formal records.
For submittals:
- Review status letter
- Comment log
- Annotated PDF
- Transmittal record
For redlines:
- Redline package
- Updated drawing set
- Revision summary
- Approval record
If possible, automate:
- Cover sheet generation
- Approval stamps
- Distribution list emails
- Archived PDF package
9) Add QA/QC and escalation points
For engineering teams, an approval workflow should include quality control gates.
QA/QC triggers
- Safety-critical design
- High-risk scope
- Contractually sensitive deliverables
- First issue on a project
- Client complaint or nonconformance
Escalation triggers
- Review overdue by SLA
- Conflicting reviewer comments
- Major scope change
- Rework after multiple cycles
- Approval blocked by missing input
Escalation should notify:
- PM
- Discipline manager
- QA manager
- Client contact, if relevant
10) Integrate with your existing systems
Your workflow platform works best when integrated with:
- SharePoint / OneDrive / Teams
- A document management system
- CAD/BIM systems
- Email/calendar
- Project controls or ERP tools
- eSignature tools
Useful integrations:
- Auto-create review tasks when a file is uploaded
- Sync metadata from project directory
- Send reminders before due dates
- Push approved files to the project archive
11) Establish templates and standards
Create reusable templates for:
- Submittal register
- Redline register
- Review checklist
- Comment log
- Approval matrix
- Turnaround SLA table
- Transmittal form
Also define:
- Naming conventions
- Folder structure
- File formats allowed
- Required metadata fields
- Stamp/approval language
12) Pilot the workflow before full rollout
Don’t deploy company-wide immediately.
Pilot steps
- Pick one project
- Pick one discipline
- Run 2–3 submittal cycles and 1 redline cycle
- Measure:
- Review turnaround time
- Number of comment cycles
- Errors caught
- User satisfaction
- Adjust rules and templates
- Train the team
- Expand gradually
13) Train users on behavior, not just buttons
A platform fails when users don’t understand the process.
Train on:
- When to submit vs. when to ask informally
- How to write useful comments
- How to close comments properly
- What approval means legally/contractually
- How to handle urgent changes
- How to avoid version confusion
14) Governance: assign ownership
You need someone accountable for workflow health.
Recommended owners
- Process owner: QA/QC or operations manager
- System owner: BIM/doc control admin or IT
- Project owner: PM
- Standards owner: discipline manager
Review workflow performance monthly:
- Late reviews
- Reopened comments
- Missing metadata
- Approvals without QA/QC
- Duplicate versions
15) A simple example workflow design
Submittal example
- Contractor uploads submittal
- Coordinator checks completeness
- Platform routes to discipline reviewer + QA/QC
- Reviewers comment in platform
- Discipline lead consolidates response
- PM signs off
- Final response issued
- Record archived
Redline example
- Field redlines uploaded
- Admin assigns to discipline lead
- Lead reviews and categorizes changes
- PM checks scope/cost impact
- CAD/BIM owner updates files
- QA/QC verifies revisions
- Revised set published
- Audit record saved
Recommended minimum viable setup
If you want a lean but effective setup, implement these first:
- Document intake form with required metadata
- Two workflows: submittal and redline
- Role-based permissions
- Routing by discipline
- Comment log with status tracking
- Version control and archive
- Automated reminders and escalations
- Final approval stamp and transmittal
If you want, I can also give you: